The Real Cost of Unplanned Downtime

Put a number on one hour of lost production, then rank your lines by what they really cost.

1 formula · 1 worksheet · 1 page for finance

THE DOWNTIME COST ICEBERG VISIBLEIN THE BUDGET HIDDENSPREAD OUT PARTSREPAIR LABOUR WATERLINE LOST MARGIN IDLE LABOURSCRAP AND RESTARTOVERTIME AND EXPEDITINGMISSED DELIVERIES
In 60 secondsThe whole worksheet on one page

The repair bill is the small part of a stop. The lost margin is the big one.

Visible

The repair bill

Technician hours and spare parts. They sit in the maintenance budget, so everyone sees them.

Hidden

The lost margin

An hour a busy line stands still is output you never sell. No budget line shows it.

Unlogged

The short stops

Micro-stops and slow running cost margin too, and they never reach the maintenance log.

1sheet

Per line: cost of one hour × lost hours a year. Rank the lines by the result, then take one page to finance.

The Real Cost of Unplanned Downtime02 / 12fabrico.io
The cost icebergVisible and hidden costs of a stop

The maintenance log sees two costs. A stop causes seven.

The hidden five are spread over payroll, quality, freight and sales, or land nowhere at all. Nobody sees the sum.

CostWhat it isWhere it lands
Spare partsParts and consumables used in the fixMaintenance budget
Repair labourTechnician hours to find and fix the faultMaintenance budget
Waterline · the maintenance log stops here
Lost marginOutput the line did not make, at contribution marginNone: the sale never happened
Idle labourOperators paid to wait for the restartPayroll, as normal hours
Scrap and restartBad parts and warm-up waste after the restartQuality and materials
Overtime and expeditingExtra shifts and express freight to hold datesPayroll and freight
Missed deliveriesLate penalties and customer orders put at riskSales
The Real Cost of Unplanned Downtime03 / 12fabrico.io
The formulaFive terms, read top to bottom

Five terms price one hour of downtime

Someone in your plant already has each number. Ask them before you estimate.

TermHow to find itWho has the numberUnit
Lost contribution marginUnits per hour × margin per unit (price minus variable cost)Controller, production manager€/h
+Idle labourOperators left waiting × loaded cost per hourProduction manager, payroll€/h
+Scrap and restartScrap and warm-up waste from stops, 12 months ÷ lost hoursQuality lead€/h
+Overtime and expeditingOvertime premium and express freight, 12 months ÷ lost hoursPlanner, logistics€/h
+Penalties, if anyLate delivery penalties, 12 months ÷ lost hoursSales, customer service€/h
=Cost of one hourSum of the five termsThis worksheet€/h
Lost hours

Unplanned stop hours in the same 12 months, from the log or the machines.

Left out on purpose

Repair labour and parts. They sit in the maintenance budget already.

The Real Cost of Unplanned Downtime04 / 12fabrico.io
The worksheetOne line · same 12 months for every figure

Price one line on one sheet

Line 12 months ending Lost hours hPrepared by
TermInputsResultUnitSource
Lost contribution margin units/h × € margin per unit€/h
+Idle labour operators × € loaded cost per hour€/h
+Scrap and restart€ in the 12 months ÷ lost hours€/h
+Overtime and expediting€ in the 12 months ÷ lost hours€/h
+Penalties, if any€ in the 12 months ÷ lost hours€/h
=Cost of one hourSum of the five lines above€/h
×Cost a yearCost of one hour × lost hours€/yr
Beside it: repair labour and parts€ in the 12 months ÷ lost hours€/h
The Real Cost of Unplanned Downtime05 / 12fabrico.io
Worked exampleOne line, 12 months

One line, worked through to the euro

150 lost hours from 180 unplanned stops

Example
TermStated inputs€/h
Lost margin600 units/h × €4.00 margin2,400
+ Idle labour6 operators × €30 loaded cost180
+ Scrap and restart180 restarts × €150 = €27,000 ÷ 150 h180
+ Overtime and expediting10 shipments × €1,800 = €18,000 ÷ 150 h120
+ PenaltiesNone in these 12 months0
= Cost of one hour2,880
ResultExample
€2,880per hour
€432,000a year

€2,880 × 150 lost hours = €432,000

HIDDEN, PER HOUR€2,880 REPAIR, PER HOUR€160

Repair: €24,000 ÷ 150 h = €160 per hour. The hidden part is 18 times that.

Round numbers so the arithmetic is easy to follow. They are not typical values: use your own.

The Real Cost of Unplanned Downtime06 / 12fabrico.io
Not only breakdownsAvailability, speed and quality, in hours

Breakdowns are only one way to lose hours

Put speed and quality losses in hours too, then price them like downtime.

ExampleOne shift, 480 min planned, running time in green
1 BREAKDOWN · 40 MIN · IN THE LOG 06:0014:00 16 SHORT STOPS × 2 MIN = 32 MIN · NOT IN THE LOG
Availability

Stopped

Planned time − run time

Breakdowns land here, usually in the log.

Performance

Running slow

Run time − ideal cycle time × total count

Short stops and slow cycles.

Quality

Making scrap

Ideal cycle time × (total − good count)

Hours spent on parts you scrap or rework.

Why short stops vanish
  • Cleared in seconds, nothing written
  • No room in a shift log for dozens of them
  • Summed up, they look like slow running

Count the stops nobody writes down. Fabrico shows every stop with its cause, per line and shift.

Request a demo
The Real Cost of Unplanned Downtime07 / 12fabrico.io
Before finance sees itFour traps

Count each euro once: four traps finance will catch

Trap

Revenue instead of margin

Use price minus variable cost. Material and energy you did not use are not a loss.

Trap

Margin and overtime for the same parts

If overtime makes the output up later, count the overtime, not the margin.

Trap

Every line treated as the bottleneck

A line with spare capacity can catch up. Its lost hour costs labour and scrap, not always margin.

Trap

Idle labour that was not idle

Operators moved to other work are not a cost of the stop. Count only paid waiting.

The fifth trap is lost hours from memory. Fabrico takes stops from machine data, each with its cause.

Request a demo
The Real Cost of Unplanned Downtime08 / 12fabrico.io
From cost to priorityRank every line the same way

Rank lines by cost per hour × lost hours

Neither number alone picks the right line. Their product does.

Example rows 1 to 4
RankLine€ per hourLost hours a year€ a yearAgainst the top line
1Line A2,880×150=432,000
2Line B900×400=360,000
3Line C5,000×60=300,000
4Line D600×250=150,000
Your lines
×=
×=

In the example, line C has the dearest hour and line B loses the most hours. Line A leads on neither and ranks first.

Rank on measured hours, not estimates. Fabrico shows availability, performance and quality per line and shift.

Request a demo
The Real Cost of Unplanned Downtime09 / 12fabrico.io
For financeThe one-page summary

Finance needs one page: hours, cost and one ask

Downtime cost summary

Plant 12 months ending
LineLost hours€ per hour€ a year
All lines
Three biggest losses
1h
2h
3h
The ask
What
Cost €
Loss it targets
Rules for the page
  • One page. The worksheets go behind it as the appendix.
  • Same 12 months and the same source of lost hours for every line.
  • Every figure named with who gave it.
  • One ask, tied to one of the three biggest losses.
The ask in one sentence

Fund for €
to attack
which costs € a year.

The Real Cost of Unplanned Downtime10 / 12fabrico.io
Where Fabrico fitsThe lost hours, without estimates

Lost hours from the machines, not from memory

Fabrico is a cloud-based MES and OEE platform for manufacturers, with maintenance management (CMMS) built in.

  • Every stop with its cause, per line and shift, from operators or AI computer vision
  • Machine data for availability, performance and quality, per line and shift
  • A stop can become a work order in the same system
  • ISO 27001 certified (DNV), hosted on AWS in an EU region
Request a demo
Fabrico shift view with every stop and its cause on a production line
The Real Cost of Unplanned Downtime11 / 12fabrico.io