Put a number on one hour of lost production, then rank your lines by what they really cost.
1 formula · 1 worksheet · 1 page for finance
Technician hours and spare parts. They sit in the maintenance budget, so everyone sees them.
An hour a busy line stands still is output you never sell. No budget line shows it.
Micro-stops and slow running cost margin too, and they never reach the maintenance log.
Per line: cost of one hour × lost hours a year. Rank the lines by the result, then take one page to finance.
The hidden five are spread over payroll, quality, freight and sales, or land nowhere at all. Nobody sees the sum.
Someone in your plant already has each number. Ask them before you estimate.
| Term | How to find it | Who has the number | Unit | |
|---|---|---|---|---|
| Lost contribution margin | Units per hour × margin per unit (price minus variable cost) | Controller, production manager | €/h | |
| + | Idle labour | Operators left waiting × loaded cost per hour | Production manager, payroll | €/h |
| + | Scrap and restart | Scrap and warm-up waste from stops, 12 months ÷ lost hours | Quality lead | €/h |
| + | Overtime and expediting | Overtime premium and express freight, 12 months ÷ lost hours | Planner, logistics | €/h |
| + | Penalties, if any | Late delivery penalties, 12 months ÷ lost hours | Sales, customer service | €/h |
| = | Cost of one hour | Sum of the five terms | This worksheet | €/h |
Unplanned stop hours in the same 12 months, from the log or the machines.
Repair labour and parts. They sit in the maintenance budget already.
| Term | Inputs | Result | Unit | Source | |
|---|---|---|---|---|---|
| Lost contribution margin | units/h × € margin per unit | €/h | |||
| + | Idle labour | operators × € loaded cost per hour | €/h | ||
| + | Scrap and restart | € in the 12 months ÷ lost hours | €/h | ||
| + | Overtime and expediting | € in the 12 months ÷ lost hours | €/h | ||
| + | Penalties, if any | € in the 12 months ÷ lost hours | €/h | ||
| = | Cost of one hour | Sum of the five lines above | €/h | ||
| × | Cost a year | Cost of one hour × lost hours | €/yr | ||
| Beside it: repair labour and parts | € in the 12 months ÷ lost hours | €/h |
| Term | Stated inputs | €/h |
|---|---|---|
| Lost margin | 600 units/h × €4.00 margin | 2,400 |
| + Idle labour | 6 operators × €30 loaded cost | 180 |
| + Scrap and restart | 180 restarts × €150 = €27,000 ÷ 150 h | 180 |
| + Overtime and expediting | 10 shipments × €1,800 = €18,000 ÷ 150 h | 120 |
| + Penalties | None in these 12 months | 0 |
| = Cost of one hour | 2,880 |
€2,880 × 150 lost hours = €432,000
Repair: €24,000 ÷ 150 h = €160 per hour. The hidden part is 18 times that.
Round numbers so the arithmetic is easy to follow. They are not typical values: use your own.
Put speed and quality losses in hours too, then price them like downtime.
Planned time − run time
Breakdowns land here, usually in the log.
Run time − ideal cycle time × total count
Short stops and slow cycles.
Ideal cycle time × (total − good count)
Hours spent on parts you scrap or rework.
Count the stops nobody writes down. Fabrico shows every stop with its cause, per line and shift.
Request a demoUse price minus variable cost. Material and energy you did not use are not a loss.
If overtime makes the output up later, count the overtime, not the margin.
A line with spare capacity can catch up. Its lost hour costs labour and scrap, not always margin.
Operators moved to other work are not a cost of the stop. Count only paid waiting.
The fifth trap is lost hours from memory. Fabrico takes stops from machine data, each with its cause.
Request a demoNeither number alone picks the right line. Their product does.
Example rows 1 to 4| Rank | Line | € per hour | Lost hours a year | € a year | Against the top line | ||
|---|---|---|---|---|---|---|---|
| 1 | Line A | 2,880 | × | 150 | = | 432,000 | |
| 2 | Line B | 900 | × | 400 | = | 360,000 | |
| 3 | Line C | 5,000 | × | 60 | = | 300,000 | |
| 4 | Line D | 600 | × | 250 | = | 150,000 | |
| Your lines | |||||||
| × | = | ||||||
| × | = | ||||||
In the example, line C has the dearest hour and line B loses the most hours. Line A leads on neither and ranks first.
Rank on measured hours, not estimates. Fabrico shows availability, performance and quality per line and shift.
Request a demo| Line | Lost hours | € per hour | € a year |
|---|---|---|---|
| All lines |
Fund for €
to attack
which costs € a year.
Fabrico is a cloud-based MES and OEE platform for manufacturers, with maintenance management (CMMS) built in.

Review your score with a Fabrico consultant, on lines like yours. No commitment.
team@fabrico.io · fabrico.io